Cleanspec
Talk to the desk

A specification question is easier than a re-validation.

We answer with the reference, the test method and the caveat — not a brochure. If a product is wrong for your room, we will say so.

What happens after you send the form

  1. Same or next business day. An application engineer confirms receipt and asks for anything missing — surface, solvent, cleanroom class, pack count.

  2. Two to three days. You receive a reference recommendation, test data summary and an indicative price for your volume.

  3. If a sample is needed. Stock references ship as sample packs; sterile references follow the production schedule.

Shenzhen · Guangdong · CN 518122

Kengzi, Pingshan District

Works & office

Room 101, Building 1, Angeer Factory, No.4 Hetian Road, Shatian Community, Kengzi Street, Pingshan District, Shenzhen, Guangdong, P.R. China 518122

  • SZXBao’an International Airport — about 90 minutes by car
  • RailPingshan high-speed station — 15 minutes by car
  • VisitsBy appointment, Mon–Fri, 09:00–16:00 GMT+8

Travelling from outside China? We will send a letter of invitation and a gate pass with the appointment confirmation.

Send the details

Fields marked * are required. Drawings can follow by email.

By sending this form you agree that we may reply to the address or number provided. We do not add contacts to marketing lists.